Scoring the Bill
How does a government decide whether a project or a law is worth it?
The Flood Control Act of 1936 tells the Army's engineers to build only where the benefits, 'to whomsoever they may accrue', exceed the costs, and Dupuit had asked in 1844 what a bridge is worth. The Island's case: a bridge across the strait, where Bo's ferry runs. Its ledger is built step by step: the counterfactual and standing; Dupuit's surplus and the rule of a half; fares that net out against Bo's lost profit; shadow wages and the cost of public funds; time, road noise priced from house sales, a beach from the trips to it, birds from surveys; a statistical life from the wage premium for risk, biased by unseen ability. The viewer scores a higher top rate (143 million static, 101 with behaviour). Discounting decides the bridge (+139 at 3%, -118 at 7%): the Green Book's Ramsey rate and its 2026 cut, OMB's rates, Weitzman. Budget scoring, the window and its sunsets, a dynamic toy, and CBO's own record since 1984; after an intermission of forty-two baselines against the deficits that happened, microsimulation and the distribution table, a small CGE and NAFTA's audited models, megaprojects' overruns and the outside view (the bridge's forecast +77 becomes a 61% chance of loss), the option to wait, a regulatory impact analysis, Goodhart's and Campbell's laws, two new Dials, the scorekeepers, the Sydney Opera House, and weights and wellbeing.
What you need. Part 3: the social accounting matrix; Part 15: externalities and the value of the environment; Part 18: welfare and the value of a statistical life; Part 23: the option to wait; Part 41: taxes and the elasticity of taxable income; Part 42: the MVPF; Part 48: the social cost of carbon; Part 50: the policy memo; Statistics, Built: regression and its biases.
- Hook
- "benefits to whomsoever they may accrue", 1936
- Ideas, models and mathematics
- cost–benefit analysis as practised, discounting, valuing life, time and nature, budget scoring and dynamic scoring, microsimulation, distribution tables, computable general equilibrium, regulatory impact
- Agora gains
- a microsimulation model
- Play it
- score a tax change
What you will be able to do
Principles and the major
- List the steps of a cost-benefit analysis, and say what the counterfactual and standing are.
- Compute consumer surplus with the rule of a half, and explain why transfers net out.
- Explain why the discount rate can decide a long-lived project, and what the agencies use.
Graduate
- Estimate a hedonic price and a value of a statistical life, and name the biases in each.
- Score a tax change statically and with an elasticity of taxable income, on a weighted survey.
- Build a distribution table from a microsimulation, and a small CGE from a social accounting matrix.
Research
- Derive Saez's revenue ratio, Weitzman's declining rate and the value of the option to wait.
- Judge an appraisal's forecasts against a reference class, and the sources of optimism bias.
Practice
- Write the break-even sentence and the tornado chart an appraisal or a regulatory analysis needs, and read a budget office's score and its record.
Contents
Each chapter has a home level. Choose a track to see what to read and watch: Principles and the major 27 min · Graduate 44 min · Research 49 min · Practice 38 min.
- 0To whomsoever they may accruePrinciples and the major3 min
- 1The steps of an appraisalPrinciples and the major2 min
- 2Valuing what has a pricePrinciples and the major3 min
- 3Valuing what has nonePrinciples and the major4 min
- 4A statistical lifePrinciples and the major4 min
- 5Play it: the minister's budgetPrinciples and the major2 min
- 6DiscountingPrinciples and the major4 min
- 7Scoring a billPractice4 min
- Intermission: forty-two baselines, 1984-2025Principles and the major
- 8MicrosimulationPractice3 min
- 9General equilibriumResearch3 min
- 10Risk, optimism and the recordGraduate4 min
- 11Regulatory impact analysisPractice2 min
- 12What targets do to numbersPrinciples and the major2 min
- 13The Dials: the discount rate and cost overrunsGraduate2 min
- 14In practice: the scorekeepersPractice2 min
- 15Frontier: weights and wellbeingResearch2 min
- Recap, problems, and the road aheadAll tracks3 min
Also on this page: Lecture · Key results · Try it · Lab · Problems · Notes and sources · Build the film.
Lecture
The text of each chapter is the film's narration, as it is spoken, so you can read along or revise without the film. The pictures are in the film.
To whomsoever they may accruePrinciples and the major3 min
In June 1936, after a spring of floods, Congress passed a Flood Control Act with a sentence that changed how governments decide. The federal government should take part in flood control, it said, if the benefits, to whomsoever they may accrue, are in excess of the estimated costs. To whomsoever they may accrue: not only to the government that pays, but to everyone. From then on the Army's engineers had to put a number on both sides of that inequality, for every dam and levee they proposed. The idea was older. In 1844 Jules Dupuit, an engineer of the French bridges and roads service, asked what a bridge is worth, and answered: not the tolls it collects, but what its users would be willing to pay over and above them. The Island has a case. Bo's ferry carries people across the strait to the north shore; the ministry is asked to build a bridge. Cost-benefit analysis is what ninety years of producing those two numbers has become, and this part does it, for the bridge and then for a law.
The question: how does a government decide whether a project or a law is worth it? Whose gains count, and against what would have happened anyway? How do you price time, quiet, a beach, or a life? How much is a benefit in fifty years worth today? What will a law cost, once people respond to it? And how far can the forecasts behind all of it be trusted?
Economics, Built. Part fifty-eight: scoring the bill. Part fifty-seven read the economy as it is. This part prices a change to it. By the end you will know the steps of a cost-benefit analysis, from whose gains count to the shadow price of a worker's time; how time, noise, a beach and a statistical life are valued, and what can bias each number; how the future is discounted, and why the rate is argued over; how a bill is scored, statically, with behaviour and dynamically, with microsimulation and general equilibrium; and why forecasts of cost run optimistic, how rules are appraised, and what targets do to the numbers they target.
What it does: The Flood Control Act; Dupuit; the strait; the question; objectives
1The steps of an appraisalPrinciples and the major2 min
Every cost-benefit analysis, from a flood wall to a rule on lorry brakes, goes through the same steps, and the textbooks and the guidance manuals, the Treasury's Green Book in Britain and the Office of Management and Budget's circular in America, agree on them. First, the options, and the counterfactual: what happens if nothing is built. For the bridge, that is not nothing; it is the ferry, still running, with traffic still growing. Every benefit is measured against that. Second, standing: whose gains and losses count. The Island's travellers count, and so does Bo, who loses his trade; whether a visitor from the mainland counts is a choice, and it should be written down. Third, the impacts, year by year: crossings, minutes, fares, deaths, decibels, and the cost of building. Fourth, a value for each in money. Fifth, discount them to today and add them up. And sixth, move every assumption to see which ones decide the answer, before recommending anything.
Here is the bridge's ledger, the Island's first year of it, in millions of Island dollars. Travellers save time on the 0.84 million crossings they make now: 5.4 million a year at the value of time. They stop paying Bo's fare: 3.4 million. A free, fast bridge makes crossings worth taking that were not worth the ferry: 4.3 million of gains on those. Bo loses his ferry's profit, 1.5 million a year. And the ferry is more dangerous than a bridge: about 0.12 fewer deaths a year, valued at the Island's value of a statistical life. Against that: three years and 300 million of building, upkeep every year, and noise for the homes by the approach road. The next three chapters explain where each of these numbers comes from.
What it does: Six steps; the counterfactual and standing; the bridge's ledger
2Valuing what has a pricePrinciples and the major3 min
Dupuit's answer, drawn. The demand for crossings: the cheaper a crossing, the more people make. Its cost to a traveller is the fare plus the value of the time it takes. On the ferry that is 4 dollars of fare and 8 dollars of time, and the Island makes 0.84 million crossings a year. On a free bridge, eight minutes cost 1.6 dollars, and crossings rise to 1.67 million. The gain to travellers is the area between the two prices, under the demand curve. On the crossings already made, each saves the whole difference: 5.4 million a year in time, and 3.4 million in fares. The new crossings gain less: the first was almost worth taking on the ferry and gains almost the whole saving, the last was barely worth taking even on the bridge and gains nothing. On average they gain half, which is why appraisers call it the rule of a half: 4.3 million.
But the fares are not a gain to the Island. Every dollar of fare a traveller no longer pays is a dollar Bo no longer receives. Bo counts too: he loses his ferry's profit, 1.5 million a year. Add the two, and what is left, 1.86 million, is exactly what the ferry cost to run: the boat's fuel, the crew, the upkeep, resources that can now do something else. That is the rule for every transfer in an appraisal, from fares to taxes: it is a gain to one side and a loss to the other, and it nets out, as long as both sides have standing.
Two more corrections to market prices. A shadow price is what a resource really costs society when its market price says otherwise. A builder who would otherwise have been unemployed gives up much less than the wage to build the bridge. If half the bridge's labour came from idle hands, valued at half the wage, the cost would fall by 30 million, and the net present value would rise from 77 million to 106. Most guidance assumes full employment and does not allow this; it is the first thing a project's promoters ask for. The other correction runs the other way. A public dollar is raised by taxes that distort, so it costs society more than a dollar: Part forty-one's marginal cost of public funds. Norway's guidance has long added twenty percent to every krone of public spending. Applied to the bridge, the net present value falls to 13 million. The bridge is still worth building, but only just.
What it does: Dupuit's surplus and the rule of a half; transfers; shadow wages; the cost of public funds
3Valuing what has nonePrinciples and the major4 min
Most of what a transport project produces is time, and time has no price tag. The starting point is the wage, what people accept for an hour of work. But an hour of travel is not an hour of work, and studies of how people choose between faster and cheaper trips find they value it at less. America's Department of Transportation values personal travel at half the median hourly household income, and asks analysts to try thirty-five and sixty percent too. Travel on the job is valued at its full cost to the employer. On the Island, the bridge's travellers' time is valued at half a wage of 24 dollars: 12 dollars an hour.
Quiet has no market, but houses do, and a house comes with its noise. Sherwin Rosen's hedonic method, from 1974, reads the price of a characteristic from the prices of the things that carry it. Here are 3,000 house sales on the Island, against the road noise outside each. Fit price on noise, and noise seems to raise prices, by 0.28 percent a decibel. The loud homes are by the coast road, and the coast road runs along the harbour, which people pay to live near. Hold the distance to the harbour and the number of rooms fixed, and each decibel lowers the price by 0.75 percent, close to the 0.7 planted in this simulation. A hedonic price is only as good as the list of everything else that comes with the house. For the bridge's approach road, ten decibels for two hundred homes is a loss of about seven percent of their value.
A beach has no entry price either, but getting there does. In 1947 Harold Hotelling suggested to the National Park Service that the cost of the journey could stand in for a price, and Marion Clawson made it a method. Ten villages on the Island lie at different distances from its beach; each trip costs fuel and an hour or so of time. The farther the village, the fewer visits each resident makes: the line through them is the beach's demand curve, with the cost of the trip as its price. A resident whose trip costs 7 dollars gets the area under the curve above that cost: a surplus of 34 dollars a year. Added over everyone, the beach is worth about 763 thousand dollars a year beyond what people spend reaching it, a number to set against a hotel that would close it.
Some things leave no trace in any market: an Alaskan coast that most Americans will never see. When the Exxon Valdez spilled its oil in 1989, the State of Alaska commissioned a national survey that asked people what they would pay to prevent another such spill: about three billion dollars in all. Exxon's experts attacked the method. A study published in 1993 asked groups what they would pay to keep migrating birds from dying in oil ponds: 2,000 birds, 20,000, or 200,000. The answers: eighty dollars, seventy-eight, eighty-eight. A hundred times the birds, the same money. A panel led by Kenneth Arrow and Robert Solow concluded in 1993 that careful surveys could still be a starting point, if they asked as in a referendum and passed a test that more is worth more. Peter Diamond and Jerry Hausman answered that answers which ignore the scope measure a warm glow, not a value, and that then no number is better than some number. Stated preference is still used, with those tests, and still argued over.
What it does: The value of time; hedonic noise; the travel-cost beach; stated preference and the birds
4A statistical lifePrinciples and the major4 min
The ferry kills people; the bridge would kill fewer. How is that valued? In 1968 Thomas Schelling pointed out that the question is not what a life is worth, but what a small change in risk is worth to the people who bear it. Take ten thousand people. Suppose each would accept nine hundred dollars a year to bear an extra risk of one in ten thousand of dying that year. Between them they accept nine million dollars, and on average one of them dies. That is the value of a statistical life: no one knows whose. It is a rate of exchange for small risks, measured in what people accept, and not the worth of anyone in particular.
Where do such numbers come from? Mostly from pay. Richard Thaler and Sherwin Rosen, in 1976, asked how much more dangerous jobs pay, other things equal. Here are the Island's workers: the risk of death in each job, and its pay. On the Island the premium is planted: nine hundred dollars a year for each extra death in ten thousand, a value of a statistical life of nine million. Regress pay on risk, and the value comes out at 3.5 million. Abler workers earn more and drift, a little, to safer jobs, so the safest jobs look well paid for reasons that have nothing to do with safety. Hold ability fixed, and the estimate is 9.2 million, close to the truth. But risk itself is measured from a few deaths in each occupation, and noisy, which pulls the estimate towards zero: 6.5 million. Real studies face both problems with fewer cures, which is part of why their estimates range from a few million to more than ten.
Part eighteen opened this Dial. The speed limits raised on rural interstates from 1987 give an upper bound of about 3 million of today's dollars. The Environmental Protection Agency's value, from mostly wage-risk studies, is about 11.5 million, and the Department of Transportation's 13.7. The number moves with the method and the people asked, and the Island's own nine million sits inside the range.
Is a statistical life the same at every age? One answer spreads it over the years left, as a value of a statistical life-year. At the Department of Transportation's 13.7 million for a forty-year-old with forty years ahead, a life-year is worth about 0.59 million. Then saving a seventy-five-year-old with ten years left is worth about 5.1 million, not 13.7. In 2003 an alternative estimate in an environmental analysis cut older people's value by 37 percent. Critics called it a senior death discount, and the budget office told agencies to stop using the adjustment. American agencies use one value for every age; how much an older person's remaining years should count is a question the method raises and cannot settle.
What it does: Schelling's arithmetic; the wage-risk regression and its biases; the Dial; the age question
5Play it: the minister's budgetPrinciples and the major2 min
Your turn. The Island's minister of finance wants to raise the top rate of income tax from forty to forty-five percent, on income above a hundred and fifty thousand. You are the scorer. Your data are a survey: 44,154 records, each with a weight saying how many taxpayers it stands for, which gross it up to the Island's 401,580. The survey takes one taxpayer in ten, but one in two at the top, where the money is. About ten thousand people have income above the threshold, and their incomes have a long Pareto tail. The static score is arithmetic: five percent of everyone's income above the threshold, added up: 143 million a year. But taxpayers respond. Part forty-one's dial puts the elasticity of taxable income at about a quarter. What will the higher rate really raise?
Here is what happened in the Island's model. With an elasticity of a quarter, incomes in the top band fall by about 2.2 percent: some effort, some deferral, some income moved into forms the tax does not reach. On every dollar that disappears, the forty percent that was already being collected goes too. The higher rate raises 101 million, about 71 percent of the static score. Emmanuel Saez gave the shortcut in 2001: the ratio is about one minus the elasticity times the Pareto exponent times the tax rate over one minus the tax rate. Here, 0.69. The answer moves with the elasticity: at nought, the static score is right; at about 0.5, the rise raises sixty million; at about 0.9, nothing, and beyond that the top of Laffer's curve is passed. So B. A score that ignores behaviour overstates what tax rises raise and what tax cuts cost, and the size of the error is the dial.
What it does: A higher top rate, static and with behaviour, on a weighted survey
6DiscountingPrinciples and the major4 min
Costs come first and benefits later, so everything turns on how the future is weighed against the present. A dollar in t years counts as one over one plus r, to the power t. At two percent a year, a dollar in thirty years is worth 55 cents today; at three and a half, 36; at seven, 13. A hundred years out, at seven percent, a dollar is worth 0.1 cents: at that rate, nothing that happens to our great-grandchildren counts for much.
For the bridge, the rate decides. Its net present value falls as the rate rises, because the costs come in the first three years and the benefits over a century. At three percent the bridge is worth 139 million; at three and a half, 77; at seven, it loses 118 million. The rate at which it breaks even, its internal rate of return, is 4.4 percent. Whether the Island builds depends on whether the rate the ministry uses is above or below that, and so the rate is not a technicality. It is the decision.
So governments write the rate down. Britain's Treasury builds it from Frank Ramsey's rule: half a percent for pure impatience, one percent for the risk that some catastrophe makes the future irrelevant, and the growth of consumption, two percent, times how fast the value of an extra pound falls as people get richer, one. Three and a half percent. For long horizons the Green Book steps the rate down: three percent after thirty years, then two and a half, two, one and a half. America's budget office took another view in 2003: money for a project could otherwise have been invested, at about seven percent, or consumed, at about three, so report both. In 2023 it cut the main rate to two percent, from the real yield on Treasury bonds over thirty years, and in February 2025 a new administration rescinded the revision and brought the 2003 rates back. In October 2026, after a review by Mark Freeman and Ben Groom, Britain's Treasury accepted a cut of its headline rate to three percent, the first change in about a quarter of a century. The same bridge passes at one ministry and fails at another.
Why should the rate fall with the horizon at all? Martin Weitzman's argument, from 1998: suppose no one knows whether the right rate for the next centuries is one percent or seven, and each is equally likely. Then the value today of a dollar in t years is the average of the two discount factors, not the factor at the average rate. The seven percent world's factor shrinks so fast that, far out, only the one percent world still counts, and the rate from each year to the next falls towards the lowest possible rate. The average rate from today falls more slowly, the shape the Green Book's steps approximate. And the market's own real rate has moved a long way: the yield on ten-year inflation-protected Treasuries averaged 0.97 percent from 2003 to 2025, below zero in some years and above two in others.
What it does: Discount factors; the bridge against the rate; the Green Book and OMB; Weitzman
7Scoring a billPractice4 min
A law is scored, not appraised. In America the Congressional Budget Office, since 1975, and the Joint Committee on Taxation estimate what each bill does to the budget; in Britain the Office for Budget Responsibility, since 2010; in the Netherlands the Central Planning Bureau, which even scores the parties' election programmes. Everything starts from a baseline: the budget under current law, projected ten years ahead. A static score is the bill's arithmetic with no one changing anything. The conventional score, the official one in Washington, lets people respond, as the Play it did, while holding the size of the economy fixed. A dynamic score lets output, prices and interest rates move too, and is published alongside for the biggest bills.
The ten-year window is a rule, and rules are gamed. A tax cut costing a hundred million a year, written to expire after eight years, is scored at 800 million. Nobody expects it to expire; if it is extended, as most such cuts are, it costs 1000 in the window and keeps costing after. The individual tax cuts of 2017 were written to expire after 2025, which lowered their score and kept the bill within the Senate's rules; in 2025 Congress made them permanent, and the cost of doing so was scored then.
What does a dynamic score add? An Island toy makes the two forces visible. A tax cut costs one percent of GDP a year, ten percent over the window. Lower taxes raise output a little, up to four tenths of a percent here, and the government taxes some of that: the growth pays back 0.86 points. But the cut is borrowed, and more debt raises interest rates, on all of the government's debt, not just the new: that adds 1.22 points. The dynamic score, 10.36, is higher than the conventional one. Real scores show both forces. In April 2018 CBO put the 2017 tax act at about 1.9 trillion dollars over its window, with growth paying back about 0.6 trillion and higher interest costing about as much again. And in 2025 its dynamic estimate of the House's tax bill was about four hundred billion dollars more costly than its conventional one. Tax cuts can pay for part of themselves; at today's debt, the interest can take it back.
How good are the scores? CBO publishes its own record, and the Data Room has every baseline since 1984. Once the effects of laws passed later are taken out, its projection of the deficit for the year it is in misses by 0.5 percent of GDP on average; six years out, by 2.0 points; eleven years out, by 2.3. The white dots are the root mean squared errors, a little larger. The biggest misses are not CBO's economics but the laws. In May 2001 it projected a surplus of 5.7 percent of GDP for 2011. Two rounds of tax cuts, two wars, a drug benefit and a stimulus later, the same projection with the new laws would have been a deficit of 5.0 percent. The actual deficit, after the financial crisis, was 8.4. A baseline is a projection of current law, and current law changes.
What it does: Baselines and three kinds of score; the window; a dynamic toy; CBO's record
Intermission: forty-two baselines, 1984-2025Principles and the major
This chapter has no narration to read.
8MicrosimulationPractice3 min
A tax law changes thousands of households in thousands of ways, and the only way to know who gains is to compute it for each. Guy Orcutt proposed simulating an economy one household at a time in 1957. A microsimulation model takes a household survey, computes each adult's income tax under the rules, adds the child benefit, works out the means-tested credit, which is withdrawn as earnings rise, and arrives at each household's net income, before and after a reform. The Island's survey has six thousand records; their weights gross them up to 176,920 households and 424,505 people, paying 1.69 billion of income tax a year. Every total in what follows is a weighted sum.
The output that ministers ask for first is the distribution table. Suppose the Island raises the tax-free allowance from fifteen to eighteen thousand: popular, and simple. It costs 114 million a year. Ranked by household income and cut into tenths, the poorest tenth gains nothing at all: its members earn too little to pay income tax in the first place. The middle gains most as a share of income, about 2 percent, and the richest tenth gains most in money, 991 dollars a household, but least as a share. A reform described as help for low earners passes the lowest earners by; only the table shows it.
Now pay for it. A top rate of forty-five percent on income above eighty thousand brings the net cost down to 17 million a year, before anyone responds; the Play it showed how much less it would raise once they do. The bottom eight tenths keep almost all their gain. The richest tenth loses 2.8 percent of its net income on average, and 75 percent of its households are worse off. Real models run the same arithmetic on real surveys and real rules: NBER's TAXSIM for American taxes, EUROMOD for every country of the European Union, the Institute for Fiscal Studies' TAXBEN in Britain, and the distribution tables of the Joint Committee on Taxation and the Tax Policy Center. The arithmetic is the easy part; the survey's weights, its missing rich and its under-reported benefits are where the work is.
What it does: A tax and benefit calculator; the distribution table of an allowance and its financing
9General equilibriumResearch3 min
Scores and appraisals mostly look at one market at a time. General equilibrium looks at all of them, and its bookkeeping is Part three's social accounting matrix. Here is a small one for the Island: two industries, food and manufactures; two factors, labour and capital; a household that owns both; and a government. Each column pays the rows: the household's column buys food and manufactures, the industries' columns pay labour and capital, the factors pay the household. Every account balances: what each receives, along its row, equals what it pays, down its column. Food uses more labour; manufactures use more capital. A computable general equilibrium model is this matrix made to respond: prices move until every market clears again.
Now tax manufactures at ten percent and hand the revenue back. In general equilibrium, people buy fewer manufactures, 58.5 instead of 60.8, and more food. Food needs more labour per unit, so labour moves into food, and the wage rises by 1.9 percent against the return to capital. Arnold Harberger's insight of 1962: a tax on one industry tends to fall on the factor it uses most, wherever that factor works, and here that is capital. The loss to the economy, the deadweight loss, is 0.20 billion, against 11.2 of revenue. Harberger's partial-equilibrium triangle gives 0.23: the right order of magnitude, a little high, because the triangle takes the supply of manufactures as flat, while in general equilibrium the factors cannot leave without their prices changing, so output falls less. For a small tax, the triangle is enough; for a large change, the economy-wide model earns its keep.
Such models are used to score trade agreements, and they can be checked afterwards. Before the North American Free Trade Agreement took effect in 1994, the leading applied general equilibrium models predicted how trade would change, industry by industry. A decade later Timothy Kehoe compared their predictions with what happened. They had drastically underestimated how much trade would grow, and their predictions for each industry were roughly uncorrelated with the outcomes; the biggest growth came in goods that had hardly been traded before, a margin the models did not have. The lesson is the same as for every forecast in this series: a model's structure is a forecast too, and it should be scored.
What it does: A social accounting matrix; a tax on manufactures; Harberger; NAFTA's models audited
10Risk, optimism and the recordGraduate4 min
Every number in the bridge's appraisal is a forecast, and forecasts of public works have a record. Bent Flyvbjerg, Mette Skamris Holm and Søren Buhl collected 258 transport projects worth ninety billion dollars. Nine in ten cost more than forecast. In constant prices, rail projects came in 45 percent over on average, bridges and tunnels 34 percent, roads 20 percent, with long tails. Their forecasts of rail passengers were 106 percent too high on average: twice the riders that came. The Channel Tunnel ran about eighty percent over budget. They asked whether this was error or lie. Errors would cancel out; these do not. Part is optimism, the planning fallacy of Daniel Kahneman's work; part, they argued, is strategic: an honest estimate loses the competition for funds.
The cure Kahneman proposed is the outside view: before trusting the inside story of this project, ask how projects like it turned out. The Island has a record: its last sixty public works, each a dot at its outturn cost over its forecast, planted to match Flyvbjerg's averages. 70 percent came in over budget; the median overrun was 14 percent, and one project in five overran by more than 53. Britain's Treasury tells appraisers to raise their cost estimates for optimism bias, and its transport department takes the uplift from the reference class. Uplifted to the eightieth percentile, the bridge's net present value at three and a half percent is minus 76 million. Run the appraisal four thousand times, with costs and traffic drawn from the record, and its forecast of plus 77 million becomes an average of minus 40, with a 61 percent chance of losing money. The bridge that passed on its own forecasts fails on the record of forecasts like them.
Uncertainty has a second consequence. A bridge cannot be unbuilt, so waiting has a value, Part twenty-three's option to wait. Suppose that a year from now the Island will know whether traffic will be thirty percent above the forecast or thirty percent below. Build now, and the expected net present value is 77 million. Wait, and build only if traffic turns out high: 93 million, even after a year's delay. The option is worth 16 million. If costs run twenty-eight percent over, as the record suggests they will, building now is worth minus 4, and waiting 54: the option to wait is worth 58 million, more than the bridge itself. Irreversible decisions under uncertainty should be taken later than a simple net present value says.
The other half of the record is evaluation after the fact, when the outcomes are known. Part forty-two's marginal value of public funds puts that on one scale. Nathaniel Hendren and Ben Sprung-Keyser scored 133 American policies, from what their beneficiaries would pay for them and what they really cost the government, long-run taxes included. Spending on children's health and education came out highest, and much of it paid for itself. Policies for adults mostly delivered between 0.5 and 2 dollars of value per dollar of net cost. An appraisal is a forecast; an evaluation is the score. Governments that commission both, and compare them, learn which of their forecasts to trust.
What it does: Megaprojects; the outside view; Monte Carlo; the option to wait; evaluation after
11Regulatory impact analysisPractice2 min
Laws are scored; regulations are appraised. In February 1981 Ronald Reagan's Executive Order 12291 required American agencies to analyse the costs and benefits of every major rule, and not to proceed unless the benefits outweighed the costs, with an office in the budget office to check. In 1993 Bill Clinton's Executive Order 12866 replaced it, asking agencies to choose the approach that maximizes net benefits, counting what cannot be quantified too, and every president since has kept its core. Circular A-4 is the manual: the baseline, the alternatives, the discount rates of the last chapter, and how to report uncertainty.
Here is one on the Island. The ministry proposes scrubbers at its two power stations: sixty million to install, forty a year to run, for twenty years. The benefits: about 4 fewer deaths a year from cleaner air, at a value of a statistical life of 9 million, and a little less carbon, at a social cost of 120 dollars a tonne. At two, three and seven percent the rule passes, by 71, 59 and 25 million. With a value of a statistical life of five million, it fails at every rate. When a benefit is hard to value, the honest report is a break-even: the rule is worth it if it prevents more than 3.6 deaths a year. A reader who doubts the epidemiology can then judge the one number that matters.
What it does: Executive orders; an Island rule by discount rate; break-even
12What targets do to numbersPrinciples and the major2 min
Every number in this part is meant to inform a decision, and once a decision depends on a number, people act on the number. Charles Goodhart, an economist at the Bank of England, put it for monetary policy in 1975: any observed statistical regularity will tend to collapse once pressure is placed upon it for control purposes. Donald Campbell, a psychologist, put it for social policy: the more any quantitative social indicator is used for social decision-making, the more subject it will be to corruption pressures, and the more apt it will be to distort and corrupt the social processes it was intended to monitor.
England gave its hospitals a target: patients in emergency departments should be admitted, transferred or discharged within four hours, for ninety-eight percent of them from 2005. Here is an Island emergency department before any target: the time each patient spends, with a long tail past four hours. Now set the target, and suppose staff move on most patients who would have breached it by less than two hours, in the last fifteen minutes before the deadline. The share seen within four hours jumps from 79 to 91 percent, and a spike grows just under the line. The typical patient's wait has not changed at all. In England the share waiting over four hours fell from 23 percent in 2002 to 5.3 in 2004. Much of that was real improvement; Gwyn Bevan and Christopher Hood also collected reports of patients moved to wards, or ambulances kept waiting outside, to beat the clock. Every appraisal target, a benefit-cost ratio above one included, invites the same, which is the best argument for scoring forecasts against outcomes.
What it does: Goodhart and Campbell; a four-hour target, gamed
13The Dials: the discount rate and cost overrunsGraduate2 min
This part opens two Dials. The first is the social discount rate. America's budget office, in 2003, asked for 7 and 3 percent, and does again. Britain's Treasury used 3.5 percent for a quarter of a century and has just accepted 3. The 2023 American revision chose 2, and two hundred experts surveyed by Moritz Drupp and coauthors averaged 2.27, with a median of two. The market's own real rate on ten-year inflation-protected bonds has averaged 0.97 percent since 2003. The status is contested: the number is partly economics, the growth and the risk of the future, and partly ethics, how much later generations should count, and a bridge or a climate rule can pass or fail on it.
The second Dial is how far public works overrun their budgets. In Flyvbjerg, Holm and Buhl's projects, rail ran 44.7 percent over, bridges and tunnels 33.8, roads 20.4, and all of them together about 28. It depends on the setting: on the kind of project, the country and the decade, and on which projects keep good enough records to be counted. But the direction does not depend on the setting. An appraisal that takes the cost estimate at its word is biased towards building.
What it does: The social discount rate (new); cost overruns (new)
14In practice: the scorekeepersPractice2 min
This is a large trade. The budget offices produce baselines and scores, and the good ones publish their own record, as CBO does. Finance ministries write the appraisal guidance and check the business cases that come to them, and in Britain publish a distribution table with every budget. Regulators write an impact assessment for every significant rule, and a central office reviews it. Development banks compute an economic rate of return for each loan, and their evaluation offices check it years later. Think tanks such as the Institute for Fiscal Studies, the Tax Policy Center and the Penn Wharton Budget Model score bills independently. And consultancies forecast the traffic and write the business cases, which is where the optimism of chapter ten is paid for. The skills are this part's: surplus, discounting, a survey and its weights, a model of behaviour, and the habit of checking the forecast afterwards.
Called it? In 1957 the government of New South Wales expected its new opera house to cost about seven million Australian dollars and to be finished by January 1963. The design, by Jørn Utzon, had just won a competition as a sketch; no one yet knew how to build its shells. It opened in October 1973, ten years late, at a cost of a hundred and two million: about fourteen times the estimate, which Guinness records as the largest proportional increase in the cost of any building. The verdict: wrong. The estimate was made before the problem was understood, and the fact that the building is now loved does not make the estimate right. It is why appraisals of new kinds of project need the widest ranges of all.
What it does: Budget offices, ministries, regulators, banks, think tanks; Called it?: Sydney, 1957
15Frontier: weights and wellbeingResearch2 min
Two questions at the edge of the method. The first: should a dollar count the same whoever gets it? Standard cost-benefit analysis says yes, and leaves the distribution to the tax system. The alternative is to weight each dollar by how much it means to the person who receives it: the median income over theirs, to a power. With the power at one point four, a dollar to a household at half the median counts 2.64 times, and one at twice the median 0.38 times. America's 2023 circular allowed such weights, and the circular was rescinded two years later; Britain's Green Book permits them as a sensitivity. The second question: must everything be turned into dollars at all? Since 2021 Britain's Treasury has allowed appraisals to count wellbeing directly, in WELLBYs, one point of life satisfaction on a scale of ten for one person for a year, valued at 13,000 pounds at 2019 prices, if the effect on wellbeing has been measured by a credible experiment.
Three developments, and what remains hard. Tax and benefit calculators are being published as open code, so that anyone can score a reform and check an official score. Demand forecasts learned from data on many past projects automate Kahneman's outside view, and they too will need a record. And evaluation after the fact is spreading: England's road agency, for one, evaluates its larger schemes a year and five years after they open, against the forecasts that justified them. What remains hard is what this part found hard: values without markets, the rate at which to weigh the centuries, and the behaviour of people who know they are being scored.
What it does: Distributional weights; the WELLBY; open models; evaluation joined to appraisal
Recap, problems, and the road aheadAll tracks3 min
So: how does a government decide whether a project or a law is worth it? By adding up, in money, what the change does to everyone it touches, against what would have happened anyway, with the future discounted and people's responses allowed for. The method is old and sound. Its inputs are forecasts, prices for things no market sells, and a discount rate that is partly ethics. So show the ranges, take the outside view, and score the forecasts afterwards.
Part fifty-eight in twelve lines. Benefits to whomsoever they may accrue, against what would happen anyway. Dupuit's surplus, and the rule of a half. Transfers net out. Noise can be priced from houses, if everything else about them is held fixed. A statistical life is a rate of exchange for small risks, and leaving out ability biases it down. In the Play it, behaviour cut the score by nearly a third. The discount rate decides long-lived projects. Dynamic scores add growth and interest. CBO's errors grow with the horizon, and the biggest misses are laws passed later. Distribution tables show who gains. The outside view turns a bridge that passes into one that probably fails. And targets change the numbers they target.
The problems: the rule of a half; why Bo's fares net out; Saez's ratio, derived; Weitzman's rate at fifty and two hundred years; the break-even sentence a regulation's analysis should contain; and a starred problem on the cost overrun at which waiting beats building. Full solutions are in the part's notes.
The reading: Boardman, Greenberg, Vining and Weimer's textbook of cost-benefit analysis; the Green Book and Circular A-4, which are short and worth reading whole; and Flyvbjerg's Megaprojects and Risk. Then the papers, from Dupuit to Hendren and Sprung-Keyser.
Next time, from scoring a law to defending a number in court. In 1997 the Federal Trade Commission sued to stop Staples from buying Office Depot. The companies said they competed with every shop that sells a pen; the Commission's economists looked at the prices in towns with one, two or three office superstores. Market definition, diversion ratios, merger simulation and damages, and what each looks like under cross-examination. Part fifty-nine: the expert witness.
Where it goes next. Part 59 takes economics into the courtroom: market definition, diversion ratios and merger simulation under cross-examination.
Key results
The part's results in one place, for revision.
Try it
Lab 58 · Scoring the bill
Appraise the Island's bridge, price what has no market, score a tax change with and without behaviour, and check the forecasts behind it all against a record.
python -m videos.economics.labs 58
needs numpy, scipy, matplotlib · download lab58.py ·
source on GitHuba year of the bridge: time, fares, new trips, Bo's profit, lives (millions) 5.38, 3.36, 4.33, -1.50, 1.06
NPV and benefit-cost ratio at 3% +139.4, 1.36
NPV and benefit-cost ratio at 3.5% +77.5, 1.21
NPV and benefit-cost ratio at 7% -118.3, 0.63
internal rate of return; NPV on the Green Book's 2003 schedule 4.37%; +98.9
tornado: discount rate +139 to -118
tornado: traffic (-30% to +10%) -38 to +116
tornado: construction cost (as forecast to +45%) +77 to -53
road noise, % of price a decibel: alone; with the harbour and rooms; planted +0.28; -0.75; -0.70
the beach: demand a - b x cost; its yearly value beyond the cost of getting there 5.67 - 0.235 c; 763 thousand
VSL from wages (millions): risk alone; ability held fixed; risk mismeasured 3.5; 9.2; 6.5
top rate 40% to 45%: static, with behaviour (millions); ratio; Saez's formula 143, 101; 0.71; 0.69
Weitzman's certainty-equivalent rate at 0, 50, 100, 200 years 4.00%, 2.30%, 1.70%, 1.35%
dynamic toy (% of GDP over ten years): conventional, growth, interest rates, dynamic 10.00, -0.86, +1.22, 10.36
allowance to 18,000 and 45% above 80,000: net cost; % change, poorest and richest tenths 16.9 million; +0.00%, -2.82%
a 10% tax on manufactures: deadweight loss in general equilibrium, Harberger's triangle 0.203, 0.231
the bridge with the reference class: forecast NPV, mean, chance of a loss +77, -40, 61%
CBO's deficit errors, % of GDP, years 1, 6, 11 of the projection 0.54, 1.98, 2.27
A bridge that passes on its own forecasts can fail on the record of forecasts like them; the discount rate and behaviour can each change the answer; and every score should be checked afterwards.
The code (80 lines; it asserts its own result)
"""Lab 58: scoring the bill: a bridge appraised from surplus to sensitivity, values without prices, a statistical life,
a tax change scored with behaviour, discounting, microsimulation, general equilibrium, optimism bias and CBO's
record."""
import numpy as np
from videos.coursekit import labs
from explainer.economics.agora import appraisal as A
TITLE = "Scoring the bill"
GOAL = ("Appraise the Island's bridge, price what has no market, score a tax change with and without behaviour, and "
"check the forecasts behind it all against a record.")
TASKS = [
"Make the bridge charge a toll of 2 (A.appraise({'toll': 2.0})). Who gains, who loses, and does the NPV rise?",
"Score the top rate with the survey's weights ignored (every weight 1, totals scaled by 400,000 / records). "
"How far off is the static score, and why?",
"Raise the reference class's traffic shortfall to 30% (A.REFERENCE['traffic'] = (0.7, 0.25)). What is the chance "
"the bridge loses money now?",
]
def run(seed=0):
lab = labs.Lab()
y = A.bridge_year()
lab.row("a year of the bridge: time, fares, new trips, Bo's profit, lives (millions)",
f"{y['time']:.2f}, {y['fares']:.2f}, {y['new trips']:.2f}, {y["Bo's profit"]:.2f}, {y['safety']:.2f}")
for r in (0.03, 0.035, 0.07):
a = A.appraise(rate=r)
lab.row(f"NPV and benefit-cost ratio at {100 * r:g}%", f"{a['npv']:+.1f}, {a['bcr']:.2f}")
lab.row("internal rate of return; NPV on the Green Book's 2003 schedule",
f"{100 * A.irr():.2f}%; {A.appraise(schedule=A.GREEN_BOOK_2003)['npv']:+.1f}")
for name, lo, hi in A.tornado()[:3]:
lab.row(f"tornado: {name}", f"{lo:+.0f} to {hi:+.0f}")
H = A.hedonic_houses(seed=58 + seed)
lab.row("road noise, % of price a decibel: alone; with the harbour and rooms; planted",
f"{H['naive']:+.2f}; {H['full']:+.2f}; {H['truth']:+.2f}")
T = A.travel_cost(seed=58 + seed)
lab.row("the beach: demand a - b x cost; its yearly value beyond the cost of getting there",
f"{T['a']:.2f} - {T['b']:.3f} c; {T['value'] / 1e3:.0f} thousand")
V = A.wage_risk(seed=58 + seed)
lab.row("VSL from wages (millions): risk alone; ability held fixed; risk mismeasured",
f"{V['naive']:.1f}; {V['controls']:.1f}; {V['noisy']:.1f}")
S = A.score_top_rate(A.taxpayers(seed=58 + seed))
lab.row("top rate 40% to 45%: static, with behaviour (millions); ratio; Saez's formula",
f"{S['static']:.0f}, {S['behavioural']:.0f}; {S['ratio']:.2f}; {S['formula']:.2f}")
W = A.weitzman([0.01, 0.07], [0.5, 0.5], [0, 50, 100, 200])
lab.row("Weitzman's certainty-equivalent rate at 0, 50, 100, 200 years",
", ".join(f"{100 * x:.2f}%" for x in W["rate"]))
D = A.dynamic_score()
lab.row("dynamic toy (% of GDP over ten years): conventional, growth, interest rates, dynamic",
f"{D['sum_conventional']:.2f}, {D['sum_growth']:+.2f}, {D['sum_rates']:+.2f}, {D['sum_dynamic']:.2f}")
Hh = A.households(seed=58 + seed)
base = A.net_income(Hh)
t = A.distribution_table(Hh, base, A.net_income(Hh, A.reform_schedule()))
lab.row("allowance to 18,000 and 45% above 80,000: net cost; % change, poorest and richest tenths",
f"{t['cost']:.1f} million; {t['rows'][0]['pct']:+.2f}%, {t['rows'][-1]['pct']:+.2f}%")
G = A.harberger_check(0.10)
lab.row("a 10% tax on manufactures: deadweight loss in general equilibrium, Harberger's triangle",
f"{G['dwl']:.3f}, {G['triangle']:.3f}")
M = A.monte_carlo(seed=58 + seed)
assert M["mean"] < M["forecast"] # the record pulls the bridge's value below its own forecast
lab.row("the bridge with the reference class: forecast NPV, mean, chance of a loss",
f"{M['forecast']:+.0f}, {M['mean']:+.0f}, {100 * M['p_negative']:.0f}%")
R = A.cbo_record()
lab.row("CBO's deficit errors, % of GDP, years 1, 6, 11 of the projection",
", ".join(f"{h['mae']:.2f}" for h in R["horizon"] if h["year"] in (1, 6, 11)))
lab.note = ("A bridge that passes on its own forecasts can fail on the record of forecasts like them; the discount "
"rate and behaviour can each change the answer; and every score should be checked afterwards.")
fig, ax = labs.figure(2, size=(11, 4.4))
rates = np.linspace(0.0, 0.1, 41)
ax[0].plot(100 * rates, A.npv_curve(None, rates), color=labs.ORANGE)
ax[0].axhline(0, color="grey", lw=0.8)
ax[0].set(title="the bridge's NPV by discount rate", xlabel="discount rate, %", ylabel="millions")
ax[1].hist(M["npv"], bins=40, color=labs.PURPLE)
ax[1].axvline(M["forecast"], color="k", lw=1)
ax[1].set(title="NPV with costs and traffic from the record", xlabel="millions", ylabel="draws")
lab.fig = fig
return lab
Now change it
- Make the bridge charge a toll of 2 (A.appraise({'toll': 2.0})). Who gains, who loses, and does the NPV rise?
- Score the top rate with the survey's weights ignored (every weight 1, totals scaled by 400,000 / records). How far off is the static score, and why?
- Raise the reference class's traffic shortfall to 30% (A.REFERENCE['traffic'] = (0.7, 0.25)). What is the chance the bridge loses money now?
Problems, with solutions
Try each problem before opening its solution.
1. The rule of a half: with linear demand, show that the gain on new trips is exactly ½(q1 - q0)(g0 - g1), and that it is an approximation otherwise.
Solution
Travellers' gain is the area under the demand curve between the two costs, the integral of q(g) from g1 to g0. With linear demand that area is a trapezoid, (g0 - g1)(q0 + q1)/2 = q0 (g0 - g1) + ½(q1 - q0)(g0 - g1): the rectangle on existing trips plus a triangle on the new ones. With a curved demand the area between the curve and the chord differs from zero, so the rule of a half over- or understates the gain on new trips, by more the larger the change in cost.
2. Bo's fares: show that counting travellers' fare savings and Bo's lost profit nets to the ferry's operating cost. When would it not net out?
Solution
Travellers save the fare f on each of the q0 crossings; Bo loses his profit (f - c) q0 - F. The sum is f q0 - (f - c) q0 + F = c q0 + F, the variable and fixed costs of running the ferry, which the bridge frees for other uses: 1.5 x 0.84 + 0.6 = 1.86 a year. It does not net out if Bo has no standing (say, a foreign operator), if part of the fare is a tax (then the tax is a transfer to the government, which also has standing, and still nets), or if the ferry's resources have no other use, when their shadow price is below their cost.
3. Saez's ratio: derive 1 - e a t/(1 - t) for a small rise in a top rate on a Pareto tail with exponent a.
Solution
Raising the top rate by dt raises, mechanically, dt times the income above the threshold: N (z_m - z̄) dt, where z_m is the mean top income. Each top taxpayer's income responds by dz = -e z dt/(1 - t), and each dollar lost costs the government t: a behavioural loss of t N z_m e dt/(1 - t). Their ratio is e (t/(1 - t)) z_m/(z_m - z̄), and for a Pareto tail z_m/(z_m - z̄) = a. Revenue with behaviour over the static score is therefore 1 - e a t/(1 - t); with e = 0.25, a = 1.5 and t = 0.45, 0.69.
4. Weitzman: with rates of 1% and 7% equally likely, find the certainty-equivalent rate at 50 and 200 years.
Solution
The certainty-equivalent factor is the average, (1.01^-t + 1.07^-t)/2: at 50 years (0.608 + 0.034)/2 = 0.321, a constant rate of 0.321^(-1/50) - 1 = 2.30%; at 200 years (0.137 + 0.0000013)/2 = 0.068, a rate of 1.35%. The rate from year 200 to 201 is already 1.00%: far out, only the low-rate world still counts.
5. A regulation prevents an unknown number of deaths. Write the break-even sentence its analysis should contain, and say why it is more honest than a point estimate.
Solution
For the Island's rule: "The rule costs 655 million in present value, less 179 million of carbon benefits; at a value of a statistical life of 9 million and a 3% discount rate, it is worth its cost if it prevents more than 3.6 deaths a year. Our best estimate is 4." A point estimate of net benefits buries the most uncertain input, the deaths avoided, inside a precise-looking total; the break-even puts it in front of the reader, who can judge it against the epidemiology.
6. Option value: with traffic 30% above or below the forecast next year, find the cost overrun at which waiting becomes worth more than building now.
Solution
Building now is worth the average of the two outcomes, (N_H + N_L)/2; waiting a year and building only if traffic is high is worth (N_H/2)/(1 + r) when N_L < 0. Waiting wins once N_L < -N_H r/(1 + r). Both values fall with the cost ratio c at the present value of construction, 290 million per unit of c; solving at 3.5% gives c = 0.89. So at the forecast cost (c = 1) waiting is already better, by 16 million, and any overrun widens the gap: the bridge's low-traffic case loses money, and the year of information is worth more than the year of crossings.
Notes and sources
Sources
The studies the film states are listed with what each shows in dials.SHOWN[58]; the new Dials (the social discount
rate; cost overruns) are in explainer/economics/dials.py, and the Called it? record of the Sydney Opera House
estimate in explainer/economics/calls.py. The methods are stated from the works cited in the chapters (Dupuit 1844,
Hotelling 1947, Orcutt 1957, Harberger 1962, Schelling 1968, Rosen 1974, Goodhart 1975, Thaler and Rosen 1976,
Campbell 1979, Kahneman and Lovallo 1993, Diamond and Hausman 1994, Weitzman 1998 and 2001, Saez 2001, Flyvbjerg,
Holm and Buhl 2002 and 2005, Viscusi and Aldy 2003, Auerbach 2005, Kehoe 2005, Bevan and Hood 2006, Boardman et al.
2018, Drupp et al. 2018, Hendren and Sprung-Keyser 2020) and computed here.
About this partfrom its README
Part 58 of a sixty-eight-part course in economics (see the series plan and the syllabus), the second of Act XI, Economics at Work. It asks how a government decides whether a project or a law is worth it. Its answer: by adding up, in money, what the change does to everyone it touches, against what would have happened anyway, with the future discounted and people's responses allowed for. The method is old and sound; its inputs are forecasts, prices for things no market sells, and a discount rate that is partly ethics. So show the ranges, take the outside view, and score the forecasts afterwards.
It opens on the sentence of the Flood Control Act of 1936 that made the Army's engineers build only where "the benefits to whomsoever they may accrue are in excess of the estimated costs", and on Jules Dupuit's question of 1844, what a bridge is worth. The Island has a case: a bridge across the strait, where Bo's ferry runs now. From there it covers:
- the steps of an appraisal: options and the counterfactual (the ferry keeps running), standing (Bo counts), impacts, values, discounting, sensitivity; the bridge's ledger for a year (millions of Island dollars: time on today's 0.84 million crossings 5.4, fares no longer paid 3.4, new crossings 4.3, Bo's lost profit -1.5, 0.12 fewer deaths a year 1.1; 300 to build over three years, 1.2 a year to keep, noise for 200 homes);
- valuing what has a price: Dupuit's surplus on the demand for crossings (a generalized cost of 12 on the ferry, 4 of fare and 8 of time, against 1.6 on a free bridge), the rule of a half for new trips, transfers that net out (fares saved and Bo's lost profit leave the ferry's running costs, 1.86 a year); the shadow wage (if half the labour would be idle, the cost falls by 30 and the net present value rises from 77 to 106) and the marginal cost of public funds (Norway's 20%: the NPV falls to 13);
- valuing what has none: time at half the hourly wage (the US Department of Transportation's rule for personal travel); road noise priced from 3,000 Island house sales (on noise alone, +0.28% a decibel; with the harbour and rooms held fixed, -0.75%, against -0.7% planted); a beach valued by the trips to it from ten villages (about 760,000 a year beyond their cost); stated preference: the Exxon Valdez survey (about $3 billion), willingness to pay of $80, $78 and $88 for 2,000, 20,000 and 200,000 birds, the NOAA panel and Diamond and Hausman;
- a statistical life: Schelling's arithmetic; the wage premium for risk on 100,000 Island jobs (3.5 million on risk alone, 9.2 with ability held fixed, against 9 planted, 6.5 with risk mismeasured); Part 18's Dial; the life-year (0.59 million at the Department of Transportation's 13.7) and the "senior discount" of 2003;
- Play it: a top rate raised from 40% to 45% above 150,000, scored on a weighted survey of 44,154 records for 400,000 taxpayers: 143 million statically, 101 million with an elasticity of taxable income of 0.25 (71%, against Saez's 1 - e a t/(1 - t) = 0.69); 60 million would need an elasticity of 0.5, and nothing one of 0.89;
- discounting: a dollar in thirty years at 2%, 3.5% and 7% (55, 36 and 13 cents); the bridge's NPV against the rate (+139 at 3%, +77 at 3.5%, -118 at 7%; an internal rate of return of 4.4%); the Green Book's Ramsey rate, 0.5% + 1.0% + 1.0 x 2.0% = 3.5%, its declining schedule, and the 3.00% for years 1 to 30 the Treasury accepted in October 2026; OMB's 7% and 3% (2003), 2.0% (2023), and the 2003 rates reinstated in 2025; Weitzman's declining rate; the market's real rate (10-year TIPS, 0.97% on average, 2003-2025);
- scoring a bill: the baseline; static, conventional and dynamic scores; the ten-year window and sunsets (the 2017 individual tax cuts, made permanent in 2025); an Island toy in which a tax cut of 1% of GDP a year costs 10.0% over the window, growth pays back 0.86 and higher interest rates on all debt add 1.22 (a dynamic score of 10.36); CBO on the 2017 act and on the House's 2025 bill; CBO's own record since 1984 (errors of 0.5% of GDP in the first year, 2.0% by the sixth, 2.3% by the eleventh, once laws passed later are taken out), and May 2001's projected surplus of 5.7% of GDP for 2011, a deficit of 5.0% with the laws passed later, and 8.4% in fact;
- microsimulation: a survey of 6,000 households grossed up to 176,920 households and 424,505 people; a tax and benefit calculator; a higher allowance (cost 114 million; the poorest tenth gains nothing, the middle about 2%); paid for by 45% above 80,000 (net cost 17 million; the richest tenth loses 2.8% of net income, three in four of its households worse off); TAXSIM, EUROMOD, TAXBEN and the distribution tables;
- general equilibrium: the Island's social accounting matrix; a 10% tax on manufactures moves labour into food, raises the wage 1.9% against the return to capital, and costs 0.20 of 11.2 raised (Harberger's triangle, 0.23); Kehoe's audit of the NAFTA models;
- risk and the record: Flyvbjerg, Holm and Buhl's 258 projects (rail 44.7% over budget, bridges and tunnels 33.8%, roads 20.4%; rail passengers overestimated by 106%); the Island's reference class (70% over budget, a median overrun of 14% and an 80th percentile of 53%); with that uplift the bridge's NPV is -76, and drawn from the record its forecast +77 becomes a mean of -40 with a 61% chance of losing money; the option to wait (16, or 58 with the usual overrun); Hendren and Sprung-Keyser's after-the-fact scores;
- regulatory impact analysis: Executive Orders 12291 (1981) and 12866 (1993), Circular A-4; an Island rule for scrubbers (net +71, +59, +25 at 2%, 3% and 7% with a value of a statistical life of 9 million; negative at 5 million; break-even at 3.6 deaths a year avoided);
- what targets do to numbers: Goodhart and Campbell; a four-hour target on an Island emergency department (within target 79% to 91%, a spike in the last quarter-hour from 4% to 16%, the median wait unchanged); England's 2002-2004 numbers;
- two new Dials (the social discount rate; cost overruns), the scorekeepers at work, Called it?: the Sydney Opera House estimate of 1957 (wrong), and the frontier: distributional weights and the WELLBY.
What is computed and built
Everything plotted is computed by compute.py with Agora's appraisal module
(explainer.economics.agora.appraisal); the narration states the cached numbers.
- The bridge. Crossings q = 1.8 - 0.08 g (millions a year) at generalized cost g = fare + 12 x minutes/60; the ferry 4 and 40 minutes, the bridge free and 8; travellers' gain q0 (g0 - g1) + (q1 - q0)(g0 - g1)/2, split into time, fares and new trips; Bo's profit (4 - 1.5) q0 - 0.6 lost; deaths 0.24 and 0.05 per million crossings at a value of a statistical life of 9; noise 0.7% a decibel on 200 homes of 0.2 million for 10 decibels, once; construction 100 a year for three years, upkeep 1.2, a hundred years of use, traffic growing 1% a year for forty years. NPV, benefit-cost ratio (Bo's loss and the noise count as costs) and internal rate of return by Brent's method.
- Hedonic prices. 3,000 houses: distance to the harbour uniform on 0-5 km; the coast road follows the harbour, so
noise = 48 + 22 exp(-distance to road/0.5) + noise; log price = log 200,000 + 0.10 (rooms - 4) - 0.06 x harbour km
- 0.007 (dB - 50) + e (s.d. 0.12); least squares with HC1 errors, with and without the harbour and rooms.
- Travel cost. Ten villages 1 to 16 km away; a trip costs 2 x km x (0.3 + 12/30); visits per resident 6 - 0.25 x cost + noise; the fitted line is the demand curve; each resident's surplus is the triangle above their cost.
- Wage and risk. 100,000 workers; ability N(0, 1); risk (deaths per 10,000 a year) max(0, 1 - 0.015 x ability + 0.5 x noise); pay 30 + 8 x ability + 0.9 x risk + N(0, 3), in thousands; risk mismeasured with noise of s.d. 0.3.
- The Play it. 400,000 incomes, log-normal (median 38,000, log-s.d. 0.7) with a Pareto tail of exponent 1.5 above 150,000; a survey of one in ten below and one in two above, weights 10 and 2; incomes above the threshold move as z ((1 - 0.45)/(1 - 0.40))^e, no lower than 150,000.
- Discounting. Constant rates; the Green Book's 2003 schedule (3.5% to year 30, then 3.0, 2.5, 2.0, 1.5, 1.0%); Weitzman's certainty-equivalent factor (1.01^-t + 1.07^-t)/2.
- Scoring. The dynamic toy: a cut of 1% of GDP a year; output rising towards 0.4% at a quarter of the gap a year, taxed at 30%; interest rates rising 0.025 points for each point of debt to GDP added, on a debt of 100% of GDP. CBO's errors are its own (outcome minus the projection adjusted for later laws, in percent of GDP), averaged by year of the projection; the averages reproduce CBO's published summary.
- Microsimulation. 6,000 households, one or two adults (each earning log-normally around 32,000, one in six not working), up to three children; weights 25 and 35; individual income tax (15,000 free, 20% to 50,000, 35% to 150,000, 40% above); 1,000 a child; a credit of 3,000 for families, withdrawn at 30% above 20,000; deciles of net income over the square root of household size.
- General equilibrium. Labour 100 and capital 100; Cobb-Douglas technologies with labour shares 0.6 (food) and 0.4 (manufactures); a household spending 40% on food; capital's price the numeraire; the wage found by Brent's method; the loss is the equivalent variation at untaxed prices; Harberger's triangle uses the compensated elasticity 0.4.
- Risk. Sixty past projects, outturn over forecast log-normal with means 1.28 (costs, s.d. 0.39) and 0.90 (traffic, s.d. 0.25); 4,000 Monte Carlo draws; the option to wait between traffic 30% above and 30% below.
- The rule. 60 up front, 40 a year for 20 years; 4 deaths a year avoided; 0.1 million tonnes of CO2 at 120 a tonne.
- The target. 20,000 patients, minutes log-normal (median 160, log-s.d. 0.5); under the target, those who would breach it by under two hours are moved, with probability 0.8, into the last fifteen minutes.
Chapter notes
| # | Chapter | What it does |
|---|---|---|
| 0 | To whomsoever they may accrue | The Flood Control Act; Dupuit; the strait; the question; objectives |
| 1 | The steps of an appraisal | Six steps; the counterfactual and standing; the bridge's ledger |
| 2 | Valuing what has a price | Dupuit's surplus and the rule of a half; transfers; shadow wages; the cost of public funds |
| 3 | Valuing what has none | The value of time; hedonic noise; the travel-cost beach; stated preference and the birds |
| 4 | A statistical life | Schelling's arithmetic; the wage-risk regression and its biases; the Dial; the age question |
| 5 | Play it: the minister's budget | A higher top rate, static and with behaviour, on a weighted survey |
| 6 | Discounting | Discount factors; the bridge against the rate; the Green Book and OMB; Weitzman |
| 7 | Scoring a bill | Baselines and three kinds of score; the window; a dynamic toy; CBO's record |
| — | Intermission | Forty-two CBO baselines against the deficits that happened, as lines and a tune |
| 8 | Microsimulation | A tax and benefit calculator; the distribution table of an allowance and its financing |
| 9 | General equilibrium | A social accounting matrix; a tax on manufactures; Harberger; NAFTA's models audited |
| 10 | Risk, optimism and the record | Megaprojects; the outside view; Monte Carlo; the option to wait; evaluation after |
| 11 | Regulatory impact analysis | Executive orders; an Island rule by discount rate; break-even |
| 12 | What targets do to numbers | Goodhart and Campbell; a four-hour target, gamed |
| 13 | The Dials | The social discount rate (new); cost overruns (new) |
| 14 | In practice: the scorekeepers | Budget offices, ministries, regulators, banks, think tanks; Called it?: Sydney, 1957 |
| 15 | Frontier | Distributional weights; the WELLBY; open models; evaluation joined to appraisal |
| — | Outro | The answer; twelve lines; problems; reading; next, Part 59, The Expert Witness |
Notes
python -m videos.economics.labs 58: the bridge's ledger, NPV by rate and IRR; the tornado; the hedonic and travel-cost estimates; the wage-risk regressions; the Play-it score and its elasticity curve; Weitzman's rates; the dynamic toy; the distribution tables; the CGE's loss against Harberger's triangle; the reference class and the Monte Carlo NPV; CBO's errors by horizon.- The interactive (course site): appraiser. The reader sets the discount rate, the value of time, the cost overrun and the traffic, watches the bridge's NPV, benefit-cost ratio and ledger move, decides whether to build, and then draws an outturn from the Island's reference class to see how the decision would have turned out.
Companion material in this repository
The syllabus's plan for this partfrom SYLLABUS.md, the plan of record
- Hook: the sentence in the Act; the question; objectives.
- The steps of a cost–benefit analysis; standing; the counterfactual.
- Valuing what has a price: surplus, shadow prices, the marginal cost of public funds.
- Valuing what has none: time, noise, a view; hedonic prices; travel cost; stated preference and the Exxon Valdez debate.
- A statistical life (Part 18): the wage-risk studies, the agencies' numbers, the age question.
- Play it: the minister's budget: score a tax change before and after behaviour responds.
- Discounting in practice: the Treasury Green Book (3.5% from 2003; 3.00% accepted in October 2026), OMB's Circular A-4 and its 2023 revision (2%, rescinded in 2025); declining rates.
- Budget scoring: the baseline, the ten-year window, static against dynamic scores; the record of the scores.
- Microsimulation: a tax-benefit calculator on a household survey (TAXSIM, EUROMOD); the distribution table.
- Computable general equilibrium: a social accounting matrix (Part 3) that responds; what GTAP did and did not predict about NAFTA.
- Evaluation after the fact: programme evaluation offices; the marginal value of public funds as a league table (Part 42).
- Risk: optimism bias in megaprojects (Flyvbjerg); option value; reference-class forecasting.
- Regulatory impact analysis; the social cost of carbon inside a rule (Part 48).
- Goodhart's and Campbell's laws: what targets do to numbers.
- Dials. 15. In practice: budget offices, finance ministries, development banks, consultancies.
- Frontier: distributional weights in official appraisal; valuing wellbeing directly.
Agora: microsim: a tax-benefit microsimulation on the Island's household survey with behavioural responses
from the Dials; a small CGE model on the Island's social accounting matrix; a cost–benefit template.
Dials: the value of a statistical life and the discount rates used by agencies; scoring errors.
Called it? cost and ridership forecasts for large transport projects against outcomes.
Reading: Boardman et al.; HM Treasury, The Green Book; OMB Circular A-4; Viscusi & Aldy 2003; Hendren &
Sprung-Keyser 2020; Auerbach 2005 on dynamic scoring; Kehoe 2005 on NAFTA models; Flyvbjerg 2014.
Build the film
python -m videos.economics.econ58.compute # the part's numbers, into .cache/econ58
python tools/build.py econ58 # render and assemble the film
EXPLAINER_TTS=silent python tools/qa_scene.py econ58 Hook # one chapter, silent, with a contact sheet
Scenes: videos/economics/econ58. Setup: see the course page. Source of these notes: the README and the scenes' narration.
Build it
python -m videos.economics.econ58.compute # every number (under a minute), into .cache/econ58/
python tools/qa_scene.py econ58 Priced # one chapter, silent, at 480p, with a contact sheet
EXPLAINER_TTS=silent python tools/build.py econ58 -q l # the whole part, silent preview
python tools/build.py econ58 # 1080p30 with narration and the series' computed score
python -m videos.economics.labs 58 # the lab
The data are the Congressional Budget Office's evaluation files (github.com/US-CBO/eval-projections: every deficit
projection since 1984 with its outcome and legislation-adjusted error, and CBO's summary statistics) and FRED's DFII10,
registered in SOURCES.md; the transcribed passages and numbers are in
explainer/economics/data/tables.py (FLOOD_1936, VALUES_58, STATED_58, DISCOUNT_58, MEGAPROJECTS,
SCORING_58, TARGETS_58, FRONTIER58, and Parts 41 and 42's TCJA_2017 and MVPF_2020).